Client: Ballymore
Principal Contractor: Cognition Land and Water
Value of contract: £44,000

 

Description of Works:

The installation of GU13N sheet piles 8.0m long to form a 36.0m x 4.8m temporary cofferdam to enable the installation of an attenuation tanks part of the Royal Wharf Development.
The piles were installed using a Movax rig.
A second visit was required in order to remove the framing and extract the sheet piles – the piles were extracted using the Movax rig

 