Gailey Reservoir

Project Details

Client: Highways England
Principal Contractor: Carnell
Value of contract: TBC

Description of Works:

The supply and installation of a temporary cofferdam in order for a new vortex separator to be installed.

The piles are 5.0m long L603 and have been installed with a 33-tonne excavator complete with an SMS PARS SCT 80 side-grip vibratory hammer. We also pre-augered the piles prior to installation with the excavator complete with a dangle drill.