A404 Power Bridge Road – Revisited

Project Details

Client: TfL (Transport for London)
Principal Contractor: Hochtief
Value of contract: £30,000

Description of Works:

Following on from 2 previous successful visits to this project, J N Piling were back for a 3rd visit.

Unlike the previous 2 visits where sheet piles were installed using the Giken Supercrush system, on this visit piles were installed using a 35t tracked excavator using pre-augering equipment to pre-auger the pile line prior to pile installation using a Movax vibratory hammer.

Piles supplied by J N Piling were 10.0m and 10.5m PU22 to form 2 No temporary retaining walls (although the piles will be left in the ground) as part of the ongoing bridge replacement works by Hochtief.