A19 / A1058 Coast Road Junction

Project Details

Client: Highways England
Principal Contractor: John Sisk & Son Ltd
Value of contract: TBC

Description of Works:

The supply and installation of steel sheet piles to form temporary retaining walls for earthworks support to allow construction of the new A19 as part of the realignment of the A19 under the existing A19 roundabout at the A19 / A1058 junction.

 

The piles installed were 4m – 6mlong GU13N. The piles were installed using a Movax side-grip vibratory hammer based on 35-tonne 360o tracked excavator. The piles were pre-augered prior to installation using an excavator mounted auger drive and auger flights.