Client: TFL
Principal Contractor: SWIP (London Underground Ltd)
Value of contract: £1,300,000

Description of Works:

Platform widening and extension works to the overground station, which included the installation of 108 No AZ26-700 steel sheet piles 9.5m – 12.0m long and 32 No AZ46-700 steel sheet piles 12.0m long during Rail Block and overhead line isolation periods.
The piles were situated between the existing station platform and residential / commercial buildings and demanded rigorous attention to noise and vibration limits. This work was undertaken using both the Giken Supercrush and Giken Water Jetting Systems.

 