Client: Highways England
Principal Contractor: Carnell
Value of contract: TBC

Description of Works:

The design, supply and installation of steel sheet piles to form a permanent retaining wall at the toe of the existing westbound off-slip embankment as part of the junction improvement works.

 

The piles installed were 6.5m long GU23N. The piles were installed using a Movax side-grip vibratory hammer based on 35-tonne 360o tracked excavator. The piles were pre-augered prior to installation using an excavator mounted auger drive and auger flights.