A406 Power Road Bridge Phase 2

Project Details

Client: TFL
Principal Contractor: Hochtief
Value of contract: £300,000

Description of Works:

During our second visit to this project, a Giken Silent Piler in Super Crush mode was used for the  installation of 15.5m PU32 sheet piles and 12.0m – 7.5m PU28 sheet piles. These formed a permanent retaining wall for the new bridge abutment construction which is a part of the ongoing bridge replacement works.