M1 Newport Pagnell

Project Details

Client: Highways England
Principal Contractor: Carnell
Value of contract: TBC

Description of Works:

The supply and installation of plastic sheet piles (MultiLock) to replace an existing plastic pile retaining wall that was damaged in a road traffic collision.

The plastic piles were installed using a rubber wheeled 360 degree excavator with an excavator mounted vibrator (EMV) during night-time motorway lane closures. The use of a rubber wheeled excavator was chosen due to the requirements of having to work from the existing motorway carriageway (thereby avoiding any damage to the carriageway) and having to mobilise and de-mobilise each night shift (the excavator being easily transportable).